GEOCOM Site Montieri
Montieri is situated in central Italy, about 2 hours’ drive from Florence. The well-preserved historical town stretches over 108 km² and has a population of 1216 people. It features a number of very old buildings with distinctive characteristics, such as stone masonry walls (filaretto natural stonework) and unusual arches and openings. These buildings are listed by the local authority as important cultural and historical symbols of Montieri. As a result, the town needed to develop innovative solutions to reduce the primary energy consumption of these buildings without carrying out major retrofitting works.
The focus of the interventions in Montieri was on the construction of a new district heating system based on geothermal energy, with a total capacity of 6 MW. Refurbishments, photovoltaic and solar thermal installations were additional measures carried out in the scope of the GEOCOM project.
Overall a gross floor area of 1986 m² was refurbished in Montieri. As a result of the energy-efficiency interventions, the energy needs were reduced from 214 kWh/m²/yr (business as ususal) to 75 kWh/m²/yr.
The data provided by the project showed that the refurbishment of the buildings resulted in final energy savings amounting to 96 MWh/yr. According to SCIS calculations, the change to the energy carriers, together with the buildings’ upgrade, achieved 148 MWh/yr of primary energy savings for those interventions affecting the buildings.
The primary energy savings for all the interventions within the demo site increase to 4950 MWh/yr while the CO2 reduction amounts to 3507 tonnes each year.
Financial & Economic
Country |
Encountered barriers |
Solution |
---|---|---|
Italy |
The procedures of the environmental impact assessment report, including the time needed for its preparation and the duration until an agreement was met with the authorities and public consultants, was considered to be too long by the investors. |
The long payback periods require considerable public support to attract private investments for any part of the project. |
Social
Country |
Encountered barriers |
Solution |
---|---|---|
Italy |
Significant retrofitting measures could not take place because the owners of the private properties regarded them as not cost-effective compared to the new geothermal district network. |
The energy-demand target to be reached by the retrofitting measures had to be reduced to gain acceptance amongst the buildings’ owners. In addition, the local administration had committed to implementing an extensive energy renovation on one or more of the public buildings in the Montieri municipality if the penetration of retrofitting measures on private buildings proved to be low. |
Best Practices
Country |
Description |
---|---|
Italy |
With regard to geothermal energy use it was favourable that no new boreholes had to be drilled. Consequently, concerns about the risk of water and soil contamination among the general population could be avoided. |
Challenges
Country |
Description |
---|---|
Italy |
The main challenges were the civil works in the narrow streets of the historic town centre and all the related interferences (structural damage and modification of building foundations, temporary blocking of entrances, placement of geothermal pipework equipment). As the municipality had to renovate other infrastructures at the same time there was an increased administrative and coordination effort. |
Italy |
Efforts by the municipality to promote energy-retrofitting measures had little impact. GEOCOM funding could not be combined with national incentives for retrofitting works, which made promoting those measures and their profitability more difficult. One additional financial solution found was the funding of solar thermal applications outside the area of the geothermal network in order to increase the use of renewable energy sources, but private investment was difficult to attract for such measures. The projects produced a considerable number of benefits, particularly from the geothermal sources for citizens. However, it is unclear to what extent such benefits can be transformed into a clear monetised value that citizens would be willing and able to cover. |
The following interventions were implemented in Montieri as part of the GEOCOM project:
Energy efficiency in buildings
- Retrofitting the building envelope
- Retrofitting the walls
- Replacing windows and doors
- Building integrated renewable energy sources
- Photovoltaics
- Thermal collectors
Energy systems integration
- Deep geothermal energy
- Construction of a geothermal district heating network
The payback period calculated by SCIS for the whole demonstration site of Montieri is 28 years. Regarding just the new geothermal district heating network, the payback period exceeds 30 years. The financial analysis shows that a profitability of the project is not given due to the high investments in comparison to the low-energy cost savings. This however does not reflect non-monetary benefits that might occur during the implementation.
The main Concerto activities at Montieri are:
- Implementing a highly innovative geothermal district heating system by using high-enthalpy fluid
- Retrofitting of selected dwellings by using integrated approaches and techniques
With the help of the innovative technological solutions the feasibility of tapping into medium enthalpy resources will be demonstrated. In the project number of dwellings served by the district heating is 425, with a total heated volume of 110,000 m3. The value of energy required and produced by the geothermal system is estimated to be 5,500 kW (20,000 GJ).
- Estimated population involved: territory of Montieri 1.200, inhabitants of Montieri: 435 (status: 2010)
- Approx. geographical area coverage: 396 ha
- Approx. energy saving: 1.172,6 TEP
- Approximate energy from RES: 25 %